bareilly eprocurement tender
bareilly, uttar pradesh
- integrated development and upgradation work from shyamganj bridge to maharishi kashyap square with 5 years maintenance.
- Authority : Directorate Of Local Bodies
- Deadline : 11 May 2026
- Value : 25.65 Crores
- Download
bareilly, uttar pradesh
- survey, investigation and designing (hydrographic, hydraulic, structural etc.) of construction of rcc strom water drain from trishoolchauraha to nakatiya river on pilibhit bypass road, bareilly.including supply of all material,labour, tandp etc.
- Authority : Uttar Pradesh Jal Nigam
- Deadline : 28 May 2026
- Value : 22.03 Crores
- Download
bareilly, uttar pradesh
- selection of agency for design, engineering, procurement, and construction (epc) of 2 bhk and 3 bhk residential apartments for nagar nigam staff at rampur garden, bareilly.
- Authority : Directorate Of Local Bodies
- Deadline : 07 May 2026
- Value : 14.84 Crores
- Download
bareilly, uttar pradesh
- in ward-19, from arjun rawat to sanjay yadav, from raja`s house to the ivri wall, in rahul`s lane and arif and qayyum`s lane, in mandeep sinha`s house lane, in razia`s lane, in deepak`s lane, from zahid to vishal khare and aman`s lane, from parvati devi to shakeel puncher`s house, from the pump house to the new mosque, from sidhu tailor to sahil battery, link lane junaid, sheshnath dubey, suresh, from santosh sharma to lalit and then to farooq ahmed, from khushi clinic to prakash singh, nemchand
- Authority : Directorate Of Local Bodies
- Deadline : 07 May 2026
- Value : 3.23 Crore
- Download
bareilly, uttar pradesh
- construction work of winding road and rcc drain and side patri from moorti nursing home to raju press and sushil agarwal to jay man kali treders and jitendra to agarwal in jatav pura ward 02.
- Authority : Directorate Of Local Bodies
- Deadline : 07 May 2026
- Value : 1.57 Crore
- Download
bareilly, uttar pradesh
- construction work of box culvert kataiya nawada near pangahli river purak nale 5x 5x 5 mtr span box culvert approach road and surakshatam work
- Authority : Public Works Department
- Deadline : 07 May 2026
- Value : 1.42 Crore
- Download
bareilly, uttar pradesh
- special repair / replacement of asbestos roof sheet, plaster and connected works in bldg no p-53, p-85 and p-38 mco bareilly, p-36 rwa office, t-08, t-89 and 101 (mess) asri at bareilly under ge (west) bareilly
- Authority : Military Engineering Services
- Deadline : 26 May 2026
- Value : 1.24 Crore
- Download
bareilly, uttar pradesh
- in ward-15 hajiapur, construction work of drain and cc road from sakalani sweets via nandrams mill to golu kapde walas house and in the link streets.
- Authority : Directorate Of Local Bodies
- Deadline : 07 May 2026
- Value : 1.02 Crore
- Download
bareilly, uttar pradesh
- ward 37, construction of cc tile footpath and hotmix road from the culvert near nadosi khadauwa pond to hyderabad road.
- Authority : Directorate Of Local Bodies
- Deadline : 07 May 2026
- Value : 96.16 Lac
- Download
bareilly, uttar pradesh
- special repair / replacement of summer cooling appliances against ber held under ge west bareilly
- Authority : Military Engineering Services
- Deadline : 02 Jun 2026
- Value : 95.04 Lac
- Download
bareilly, uttar pradesh
- beautification of pond and pathway work in ward-73.
- Authority : Directorate Of Local Bodies
- Deadline : 07 May 2026
- Value : 84.40 Lac
- Download
bareilly, uttar pradesh
- repair and maintenance of the link road from ruheli bridge, via sisena, up to gahluia under mandi samiti, bareilly.
- Authority : Rajya Krishi Utpadan Mandi Parishad
- Deadline : 08 May 2026
- Value : 79.99 Lac
- Download
bareilly, uttar pradesh
- construction work of cc road and drain from devesh sharma office to rajendra parsad sharma and tiwari sadan in akanksha colony ward 10.
- Authority : Directorate Of Local Bodies
- Deadline : 07 May 2026
- Value : 77.41 Lac
- Download
bareilly, uttar pradesh
- construction of the road from khitousa gautiya to kaithola. development block fatehganj west
- Authority : Rural Engineering Department
- Deadline : 20 May 2026
- Value : 70.86 Lac
- Download
bareilly, uttar pradesh
- r/m of link road, pilibhit road, c-sidepur, chunnilal talkies under mandi samiti bailley
- Authority : Rajya Krishi Utpadan Mandi Parishad
- Deadline : 08 May 2026
- Value : 69.49 Lac
- Download
bareilly, uttar pradesh
- repair and maintenance of the link road from visharatganj bhindora road to mohammadganj chinjari pastor, under the mandi samiti, bareilly.
- Authority : Rajya Krishi Utpadan Mandi Parishad
- Deadline : 08 May 2026
- Value : 66.42 Lac
- Download
bareilly, uttar pradesh
- construction of boundary wall at kgbv, bhuta, bareilly (u.p)
- Authority : Uttar Pradesh Jal Nigam
- Deadline : 15 May 2026
- Value : 64.12 Lac
- Download
bareilly, uttar pradesh
- construction of the road from kurtara to satuiya khas, via the lakshmanjati temple. development block fatehganj west
- Authority : Rural Engineering Department
- Deadline : 20 May 2026
- Value : 61.90 Lac
- Download
bareilly, uttar pradesh
- repair and maintenance of link road from bahari nadeli road to sakaras, under mandi samiti bahari.
- Authority : Rajya Krishi Utpadan Mandi Parishad
- Deadline : 08 May 2026
- Value : 59.30 Lac
- Download
bareilly, uttar pradesh
- construction of an interlocking tile road from the bareilly-pilibhit route to chhatrapati shivaji chowk in mahanagar colony development block bithri chainpur.
- Authority : Rural Engineering Department
- Deadline : 20 May 2026
- Value : 58.48 Lac
- Download
