bachra eprocurement tender
bachra, jharkhand
- development of r and r site at hurhurwa under magadh ocp of magadh-sanghamitra area.
- Authority : Central Coalfields Limited
- Deadline : 12 Dec 2026
- Value : 18.23 Crores
- Download
bachra, jharkhand
- development of r and r site at hurhurwa under magadh ocp of magadh-sanghamitra area.
- Authority : Central Coalfields Limited
- Deadline : 12 Dec 2026
- Value : 18.23 Crores
- Download
bachra, jharkhand
- provision of suitable earthing for 03 nos. tsu (6.6 kv/440 v) proposed to be installed under ashok ocp, piparwar area.
- Authority : Central Coalfields Limited
- Deadline : 03 Dec 2026
- Value : 2.12 Lac
- Download
bachra, jharkhand
- provision of suitable earthing for 03 nos. tsu (6.6 kv/440 v) proposed to be installed under ashok ocp, piparwar area.
- Authority : Central Coalfields Limited
- Deadline : 03 Dec 2026
- Value : 2.12 Lac
- Download
bachra, jharkhand
- cleaning, testing and adjusting of 2500 nos. of ci test weight (20 kg each) for annual verification and stamping of 02 nos. of weighbridges- wb-i (50 t ) and wb-ii (50 t) capacity electronics type road weighbridge under chp-cpp, piparwar.
- Authority : Central Coalfields Limited
- Deadline : 30 Nov 2026
- Value : 1.23 Lac
- Download
bachra, jharkhand
- cleaning, testing and adjusting of 2500 nos. of ci test weight (20 kg each) for annual verification and stamping of 02 nos. of weighbridges- wb-i (50 t ) and wb-ii (50 t) capacity electronics type road weighbridge under chp-cpp, piparwar.
- Authority : Central Coalfields Limited
- Deadline : 30 Nov 2026
- Value : 1.23 Lac
- Download
bachra, jharkhand
- complete repairing/rewinding of 250 kva, 3.3 kv/440 v transformer, make-gec ltd, sl. no.-missing installed at mines for welding purposes under ashoka ocp, piparwar area.
- Authority : Central Coalfields Limited
- Deadline : 07 Dec 2026
- Value : Refer Document
- Download
bachra, jharkhand
- installation of earth pits with copper electrode (chemical earthing) with providing g.i strip for proper matting i.e interconnection of earth pits in road and rail weighbridge and sky netting of la pole of wb-12 and 13 under ashok ocp piparwar area.
- Authority : Central Coalfields Limited
- Deadline : 07 Dec 2026
- Value : Refer Document
- Download
bachra, jharkhand
- annual maintenance service, subscription renewal of telemetry system software and calibration from nabl test lab for 07 nos electromagnetic / ultrasonic flow meter and 02 nos piezometer installed at different locations for measurement of mine water discharge and ground water level respectively under ashok ocp, piparwar area.
- Authority : Central Coalfields Limited
- Deadline : 07 Dec 2026
- Value : Refer Document
- Download
bachra, jharkhand
- annual maintenance service, subscription renewal of telemetry system software and calibration from nabl test lab for 07 nos electromagnetic / ultrasonic flow meter and 02 nos piezometer installed at different locations for measurement of mine water discharge and ground water level respectively under ashok ocp, piparwar area.
- Authority : Central Coalfields Limited
- Deadline : 07 Dec 2026
- Value : Refer Document
- Download
bachra, jharkhand
- complete repairing/rewinding of 250 kva, 3.3 kv/440 v transformer, make-gec ltd, sl. no.-missing installed at mines for welding purposes under ashoka ocp, piparwar area.
- Authority : Central Coalfields Limited
- Deadline : 07 Dec 2026
- Value : Refer Document
- Download
bachra, jharkhand
- installation of earth pits with copper electrode (chemical earthing) with providing g.i strip for proper matting i.e interconnection of earth pits in road and rail weighbridge and sky netting of la pole of wb-12 and 13 under ashok ocp piparwar area.
- Authority : Central Coalfields Limited
- Deadline : 07 Dec 2026
- Value : Refer Document
- Download
bachra, jharkhand
- cleaning testing and painting of test weights 3145 nos each of 20 kg to be stamped and to be used during stamping of road wb no. 1 9 12 and 15 under ashok project ppr area.
- Authority : Central Coalfields Limited
- Deadline : 30 Nov 2026
- Value : Refer Document
- Download
bachra, jharkhand
- fabrication/repairing of skid foundation base with using old iron material for the pump base (2000 gpm capacity) to be installed at patch-a under ashok ocp.
- Authority : Central Coalfields Limited
- Deadline : 30 Nov 2026
- Value : Refer Document
- Download
bachra, jharkhand
- cleaning testing and painting of test weights 3145 nos each of 20 kg to be stamped and to be used during stamping of road wb no. 1 9 12 and 15 under ashok project ppr area.
- Authority : Central Coalfields Limited
- Deadline : 30 Nov 2026
- Value : Refer Document
- Download
bachra, jharkhand
- fabrication/repairing of skid foundation base with using old iron material for the pump base (2000 gpm capacity) to be installed at patch-a under ashok ocp.
- Authority : Central Coalfields Limited
- Deadline : 30 Nov 2026
- Value : Refer Document
- Download
